The world’s first 16MW wind turbine has been connected to the Chinese power grid, from the Pingtan offshore wind farm. The park’s developer had announced, back on June 28, that installation work had...
Read MoreEurope’s highest cable car, Matterhorn Glacier Ride II, is now connecting the Swiss Matterhorn Glacier Paradise mountain station and the Italian Testa Grigia at 3,883 and 3,480 meter altitudes respec...
Read MoreThe 2,200-meter facility will be the first railway bridge to connect the 2 countries. The construction which initiated in 2014, will link Tongjiang city in China with Nizhneleninskoye in...
Read MoreCheck the shear connection for the IPE450-S275 for the design shear VEd=200KN. Bolts M20-8.8, plate thickness t=10mm. Check the shear connection for the IPE450-S275 for the design shear VEd=200KN. Bo...
Read More